Project Particulars

  • Client : Private Self Build
  • Location : Worthing, West Sussex
  • Sector : Residential / Self Build
  • Project Value : £78,000
  • Duration : 3 Weeks
  • Completion Year : 2025
  • Principal Contractor : BVMH Groundworks

Piled reinforced raft foundation

BVMH Groundworks were approached by a self-build client who typically carried out his own groundworks. However, when his structural design specified CFA piles and a reinforced raft foundation, he recognised the complexity was beyond the scope of his own plant and experience. Seeking a reliable partner, he contacted BVMH to price and deliver the full package.

Within 48 hours of enquiry, we visited the site, and a full itemised quotation was issued the following day. Ten days later, our team and resources were mobilised, ready to begin works.

The Project

Our scope covered the complete delivery of a piled reinforced raft foundation system, including:

Drainage & Excavation Work.

The programme was set at three weeks and delivered in full – giving the client peace of mind and confidence that the most critical stage of his build was executed professionally.

Challenges & Solutions

The challenge with this project was less about unforeseen site issues and more about the precision and coordination required between piling, reinforcement, and civils installation. Our in-house setting-out engineer ensured millimetre accuracy throughout, while our direct control of plant and resources allowed us to keep momentum without delays.

We also undertook the client’s mains connections in the highway, coordinating with the relevant authorities to ensure a smooth approval and installation process. By keeping all services under one roof, we eliminated the typical delays of multiple contractors and ensured everything was completed on time.

Groundworks for housing extension and drainage systems in progress.
Excavation and drainage for new builds and extensions.

Tools, Tech & Teamwork

For this project we deployed:

Client Feedback

The client commented:

“As a self-builder I would always undertake the groundworks myself. I even have my own small machine. However, when we received the structural design and were made aware that it was piling and raft foundation, this was definitely out of my skill set. I contacted BVMH Groundworks – their director turned up within 48 hours and 24 hours after that I had a comprehensive quotation with everything broken down and no hidden costs. We decided to use BVMH to undertake this project and I can quite comfortably say my confidence has been reinstalled with this contractor.”

Reflections

This project is a great example of how BVMH adapt to clients’ individual needs – whether it’s a self-builder requiring specialist expertise or a commercial operator needing large-scale delivery. With our resources, technical knowledge, and commitment to precision, we gave the client a foundation they could trust, built on time and to specification.